Your estimate data never leaves your device. No account, no email, no watermark and nothing stored on our server. Everything — the maths, the PDF, the Word file and the Excel file — is made in your browser.
How to make a contractor estimate in 6 steps
- Choose your trade and whether you are sending an estimate or a fixed-price quote. Typical line items with sample quantities and typical starting rates are filled in for you.
- Add your business name, phone or email, licence number and logo. Tick “Remember my business details” and they fill in automatically next time.
- Add the customer, the job name and the job site address. Pick the job state if you want a warning about deposit limits.
- Check the scope of work, the list of what is not included, your terms, the start window and your warranty.
- Replace the sample quantities and rates with your own prices. Mark which lines are taxable, then set your tax rate, discount and deposit.
- Tick the “Did you forget?” checklist, pick a design and colour, then download a PDF, Word or Excel file — or share it straight to WhatsApp or email.
What to include in a contractor estimate
A good estimate answers every question a customer will ask before they say yes. It also protects you when the job changes. Include:
- Your business details: business name, phone, email, address and licence or tax ID. Many states require the licence number on written estimates.
- Customer and job: the customer’s name and contact details, a short job name and the job site address if it differs from the billing address.
- Estimate number, date and validity: a unique number you can refer to, the date, and how long the price is valid (30 days is common).
- Scope of work: what you will do, in plain words. A clear scope is the cheapest insurance you can buy.
- Exclusions: what is not in the price — rotten decking, permit fees, drywall repair, moving furniture. This list stops “I thought that was included” arguments.
- Line items: description, quantity, unit and rate for each part of the job, so the customer can see where the money goes.
- Totals: subtotal, any discount, tax, total, deposit and balance due.
- Payment schedule and methods: deposit on signing, any progress payments, the final balance, and how you accept payment.
- Schedule and warranty: an expected start window, duration, working hours and your workmanship warranty.
- Terms and a change-order clause: state that any work outside the scope will be quoted in writing and approved before it begins.
- Signature lines: a place for the customer to accept the estimate and date it.
Estimate vs quote vs bid vs invoice
| Document | What it means | When to use it |
|---|---|---|
| Estimate | Your best price for the job. The final cost can change if the scope or site conditions change. | Most residential and service work, especially when you cannot see everything before you start. |
| Quote | A fixed price for a clearly defined scope. Changes are priced separately. | Small or well-defined jobs where you are confident about materials and time. |
| Bid | A formal price submitted in competition with other contractors, usually against plans and a deadline. | Commercial and public work, general contractor packages. |
| Invoice | A request for payment for work done (or a deposit or progress payment). | After the customer accepts the estimate and work is under way or finished. |
The estimate maker has an Estimate / Quote switch. It changes the title, the wording and the file names; the numbers stay the same.
How to price a job: markup, margin, contingency and deposits
Markup is not the same as margin
Markup is profit as a percentage of your cost. Margin is profit as a percentage of the price. If a job costs you $10,000 and you add a 25% markup, the price is $12,500 — but your margin is only 20%. To earn a 25% margin you need a 33.3% markup (price $13,333). Turn on “Show my costs” in step 5 to see both numbers live. Your costs are private and never printed.
Overhead
Overhead is what it costs to run your business even when you are not on a job: insurance, vehicles, phone, software, office time. If your margin is lower than your overhead percentage, the job is losing money even though the customer is paying. Enter your overhead in the margin section and the tool will warn you.
Contingency
On remodels and repairs you often cannot see what is behind the wall. A contingency of 5–10% shown openly on the estimate is more honest than padding every line, and it gives you room to deal with surprises without a fight.
Deposits
A deposit covers materials and commits the customer to the job. Many contractors ask for 10–33%. Some states limit deposits on home improvement contracts — for example, California limits the down payment to $1,000 or 10% of the contract price, whichever is less. Pick the job state in step 3 and the tool will warn you if your deposit is over a known limit. Always check your state’s current rules; this is information, not legal advice.
Worked example: a roofing estimate
Here is the worked example built into the tool (use “Load a worked example” in step 1 to open it). A 24-square roof replacement, with 6% sales tax on materials only and a 10% deposit:
| Line item | Qty | Rate | Amount | Taxable |
|---|---|---|---|---|
| Tear-off and disposal | 24 squares | $85.00 | $2,040.00 | Yes |
| Architectural asphalt shingles | 24 squares | $125.00 | $3,000.00 | Yes |
| Synthetic underlayment | 24 squares | $40.00 | $960.00 | Yes |
| Installation labour | 32 hours | $65.00 | $2,080.00 | No |
- Subtotal: $8,080.00
- Taxable amount: $6,000.00 (labour is not taxed in this example)
- Tax at 6%: $360.00
- Total: $8,440.00
- Deposit due on signing (10%): $844.00
- Balance due: $7,596.00
Notice that tax is charged only on the $6,000 of taxable lines, not on the full $8,080. Charging tax on labour where it is not taxable is one of the most common estimate mistakes.
Common estimate mistakes (and how to avoid them)
- Forgetting the small costs. Permits, dumpsters, disposal fees, travel and a set-up or clean-up day add up. The “Did you forget?” checklist exists for exactly this.
- A vague scope. “Replace roof” invites arguments. Say what you will remove, what you will install and to what standard.
- No exclusions. If it is not listed as excluded, the customer may assume it is included.
- Taxing the wrong lines. Mark each line taxable or not, and apply discounts before tax.
- No expiry date. Material prices move. A 30-day validity date protects you.
- No change-order clause. Every estimate from this tool includes one automatically.
- Typing totals by hand. One wrong cell in a spreadsheet can cost thousands. Let the tool do the maths; the Excel download keeps live formulas so totals update if you edit it later.
- Never following up. Many jobs are won on the second or third contact. The tool gives you a dated follow-up plan with copy-and-paste messages.
Sales tax on contractor estimates
States treat contractor work in three broad ways. In some, labour and materials are both taxable. In many, materials are taxable but separately listed labour is not. In others, a contractor improving real property pays sales tax when buying materials and charges no tax on the estimate. The tool lets you pick the model that fits your state and warns you if a labour line is marked taxable in a “materials only” state. It never changes your numbers without telling you. Check with your state revenue department or accountant if you are unsure.
After you send it: follow up
When you download, the tool suggests a simple follow-up plan: confirm they received it on day 2, add something useful on day 5, mention scheduling on day 10 (only if it is true), remind them the price expires on day 20 and close it politely on day 45. Each message is ready to copy into a text or email.
Frequently asked questions
Is the estimate maker really free?
Yes, for 3 documents a month (estimates and invoices together), with no sign-up, no email and no watermark — free files just carry a small “Made with ToolbeltDocs.com” line in the footer, which Pro removes. Making and previewing are always unlimited. Need more? ToolbeltDocs Pro is unlimited — every $29 template pack includes 12 months of it, or get lifetime Pro for $69. One payment, no subscription.
Is my information saved or sent anywhere?
No. Everything is calculated and generated in your browser. Your drafts, recent estimates, price book and business details are saved only on your own device, and you can erase them at any time with “Erase all my data on this device”.
Can I download the estimate as PDF, Word or Excel?
Yes. All three are made from the same information, so they show identical numbers. The Word file uses a real table you can edit, and the Excel file keeps live formulas so totals recalculate if you change a quantity or rate.
Can I add my logo and choose the colours?
Yes. Upload a PNG or JPG logo in step 2, then choose one of three PDF designs and a colour in the download step. Your colour choice is remembered on your device.
What is the difference between an estimate and a quote?
An estimate is your best price and can change if the scope or site conditions change. A quote is a fixed price for a defined scope. Use the Estimate / Quote switch in step 1.
How do I charge tax only on materials?
Each line has a Taxable checkbox. Materials lines are taxable by default and labour lines are not. Enter your tax rate and it is applied only to the taxable lines, after any discount.
Can I use it on my phone?
Yes. The tool works on phones and tablets. Your draft is saved as you type, so you can start on site and finish later on the same device.
How much deposit can I ask for?
It depends on your state and the type of job. Some states limit deposits on home improvement contracts — California, for example, limits them to $1,000 or 10% of the contract price, whichever is less. Pick the job state in step 3 to see a warning, and check your state’s current rules.
Related templates
Prefer a blank form? Browse our free estimate templates for each trade, or get every template for your business in one of our template packs — $29 once, not $29 a month.