Free Daily Job Log Template (Excel, Google Sheets, PDF)

Document site work with a clear daily job log. Use the editable fields to record the job details, responsibilities and follow-up.

Free daily job log template preview — printable PDF form

Illustrative document mockup · Daily Job Log↗ Open full size (new tab)

Free template

Download your daily job log template

No signup needed. Excel 2016 or later. For Google Sheets, import the Excel file with File → Import → Upload.

Prefer Word? Download the editable .docx

Get the details right

What to include

Describe the work area, inclusions, allowances, schedule assumptions and exclusions. Keep scope changes separate from the original estimate.

  • Project name, address and reference number
  • Date and responsible person
  • Specific work or issue being recorded
  • Cost or schedule impact, where relevant
  • Status, follow-up and acknowledgement

Create a factual record of each working day

Use a separate dated entry for each day and identify the project, preparer and relevant work areas. Record who attended and the activities actually carried out, with hours or time periods where useful. A daily log should distinguish observed facts from reports received from someone else. Avoid rewriting earlier entries without a visible correction or dated explanation.

Include weather and site conditions when they affected the work, deliveries and their condition, equipment use, inspections or visits, and important instructions received. Describe delays and unresolved issues specifically enough that another reviewer can understand what happened. Refer to supporting photographs, delivery records or service reports using clear identifiers rather than relying on a large collection of unnamed attachments.

Close with outstanding actions, responsible people and the next follow-up date. Keep sensitive personnel, medical or access information in appropriately controlled records rather than placing it unnecessarily in the general log. Preserve the log in the project's agreed filing system with its original date and later corrections identifiable. A contemporaneous record can help explain the project's history, but this template does not determine legal evidentiary rules or a universal retention period.

How to fill it in

  1. Identify the day and project

    Enter the date, site, preparer, attendance and work areas.

  2. Record activities and conditions

    Describe actual work, time periods, weather effects, deliveries and equipment use.

  3. Document issues factually

    Separate observations from reports and reference photographs or instructions clearly.

  4. Close with outstanding actions

    Assign responsibility and follow-up dates, then preserve the dated entry and any later correction.

A worked example

TimeActivity / workCrew / tradeNotes
08:00Site preparationCrew AAccess checked
09:00Material deliverySupplierCondition reviewed
10:00InstallationCrew ARecord actual work
16:00Cleanup and reviewSite leadOpen items noted

Illustrative records only. Replace with the actual project details.

Keep the record useful

Write specific facts, assign responsibility and record the follow-up date.

Keep completed items and unresolved issues distinct. Confirm the record with the responsible person before filing it.

Free template

Ready to use it?

No signup needed. Excel 2016 or later. For Google Sheets, import the Excel file with File → Import → Upload.

Prefer Word? Download the editable .docx

Frequently asked questions

Is this template free?
Yes. Download Excel, PDF or Word without an account or email signup.
How do I use this in Google Sheets?
Download the Excel file, then import it into Google Sheets. Check formatting and formulas after importing.
How long should I keep daily job logs?
Use the retention requirements and recordkeeping policy applicable to the project, contract and location. There is no single period supplied by this template. Keep related photographs, delivery records and dated corrections connected to the log.
What should a daily job log say about a delay?
Record the observed condition, affected activity, relevant time and the instruction or action taken. Distinguish facts from assumptions about blame. Identify follow-up responsibility and supporting records where available.